Lyndonville native wants to build ‘greatest playground in the land’ in his hometown

By Tom Rivers, Editor Posted 20 August 2026 at 7:43 am

Parkitects will install phase 1 of new playground in October

Photos by Tom Rivers: Ben Frasier, owner and president of Parkitects, goes over the layout of a playground to be built in phases at Lyndonville Central School, with phase 1 to be constructed in early October. Frasier is a 1988 Lyndonville graduate.

LYNDONVILLE – A Lyndonville graduate who owns a company that designs and installs playgrounds wants to build the “greatest playground in the land” in his hometown.

Ben Frasier, owner and president of Parkitects, shared his vision of the playground with the Lyndonville Board of Education on Tuesday. Frasier said the funds are already in place for phase 1 of the playground. Parkitects will install the first phase in early October.

The company based in Buffalo has built million-dollar playgrounds at several school districts, including one in Kendall last year. He wants the best one for his hometown, and he said Parkitects will be doing it at a discount with some donated apparatus and in-kind services.


Phase 1 includes a We-Go-Round, Sway Fun Glider, We-Saw and other equipment that will be accessible to kids of all abilities and mobilities. Lyndonville two years ago approved using $160,000 in its federal American Rescue Plan Act (ARPA) stimulus funds toward the project, with Parkitects donating other features, including a sensory dome.

The new playgrounds are inclusive for people of abilities and mobilities. He highlighted several new playgrounds including the one at Kendall Elementary School. As he showed photos of those elaborate playgrounds, Frasier asked, “Why can’t the kids in Lyndonville have this?”

Frasier said he has profound memories of growing up in Lyndonville and playing on the former wooden playground at the school. The community came together nearly 50 years ago to build that playground.

“This playground taught me about the power of community,” he said showing a photo of the former site.

Ben Frasier shared a photo of the former wooden playground at the school. He said he was 10 when it was constructed at Lyndonville and the community helped install it. “I played on that playground everyday for two years,” he said. “I was really shaped by play.”

Lyndonville already has $160,000 set aside for phase 1. The Board of Education about two years ago approved that amount in federal stimulus money towards the first phase of the new playground. Parkitects also is donating some extra pieces to the first phase and company will install it in early October.

Frasier will be at a back-to-school open house to share his plans for an even bigger playground. He also will be attending two school assemblies in September to build excitement with students for phase 1.

On September 10, there will be a meeting for the community from 6 to 8 p.m. to discuss the playground plans and how it will be designed for inclusive play for children of all abilities.

Frasier wants the larger project and he believes through fund-raising, grants and donations Lyndonville can make it a reality.

Phase 2 would include some larger equipment including Super Netplex Towers, ZipKrooz, Oodles Swing, Sensory Tunnel, Rollerslide with Exit Bench, and a 7-Post Hex Net.

He would like to see phase 2 be constructed next year. He also would like to see a phase 3 for a full buildout that would include a shelter for parents and grandparents to stay in the shade while children are on the playground.

Dr. Heather Lyon, the district superintendent, thanked Frasier for bringing a strong passion and commitment to the project, which she said will not include any local school funding. She looks forward to seeing kids of all abilities on the playground.

“Students who have never been able to use our playgrounds will be able to and that is something to celebrate,” Lyon said.