Wind turbines generate little power, don’t provide consistent energy
Editor:
Apex Lighthouse Wind Project Application should be denied, with objectors compensated for this farce.
Scarce taxpayer funds in local governments are being wasted opposing a scheme that is becoming more impossible to implement on each passing day.
Facts on table below are from NYISO studies and actual wind speeds scattered across NYS:
2015 Wind “Capacity Factor” was 26% (That means for 74% of 2015 in NYS turbines sat idle)
2015 Hydro “Capacity Factor” was 68% (Transmission constraints restrict Niagara Hydro Power)
2015 Nuclear “Capacity Factor” was 94% (Extremely reliable and economical)
Table below reflects on a high wind weather pattern that developed in NYS around November 20. Readers can see with average wind speeds 13-20 MPH there is still way too much idle MW. When average wind speeds drop to 6-8MPH idle MW becomes overwhelming unproductive.
NYS Real NYS Wind Wind Wind Low Avg. High
Time Load Available Generating Idle Wind Wind Wind
MW MW MW MW MPH MPH MPH
17,622 1754 1420 334 3 18 33 2 PM Sun Nov. 20
19,938 1754 1537 217 7 19 30 6 PM Sun Nov. 20
15,086 1754 1308 446 6 18 25 6AM Mon Nov.21
20,088 1754 1429 325 8 20 31 4 PM Mon Nov 21
16,044 1754 1184 570 7 15 28 6 AM Tue Nov 22
20,524 1754 794 960 5 13 25 5 PM Tue Nov 22
15,744 1754 165 1589 3 8 17 6 AM Wed Nov 23
20,416 1754 90 1664 3 6 12 6 PM Wed Nov 23
14,192 1754 483 1271 3 7 14 6 AM Thu Nov 24
16,800 1754 228 1526 3 6 10 6 PM Thu Nov 24
13,862 1754 130 1624 3 6 10 6 AM Fri Nov 25
18,410 1754 179 1575 3 6 13 7 PM Fri Nov 25
13,616 1754 151 1603 3 6 9 6 AM Sat Nov 26
18,354 1754 149 1605 3 7 20 6 PM Sat Nov 26
Smart people at the PSC already know that generating power from wind cannot succeed no matter how many towers are erected and how many thousands of square miles they occupy. APEX and wind has no sustainable and reliable future in NY’s energy supply picture.
Gregory G. Woodrich
Williamsville