Sidewalk added at intersection of 98, 104

By Tom Rivers, Editor Posted 8 September 2016 at 3:57 pm
090816_sidewalk2

Photo by Tom Rivers

GAINES – Keeler Construction employees installed a new sidewalk today at the southwest corner of the routes 98 and 104 intersection in Gaines, a walkway across from the Village Inn.

The sidewalk stretches from Route 104 to the blacksmith shop that is part of the Cobblestone Museum.

Keeler did the project after replacing pavement on Route 98 from 104 south past the Village of Albion.